Operating Room Renovation: Scope, Phasing and Turnover

November 22, 2026
Operating Room Renovation: Scope, Phasing and Turnover

An operating room renovation succeeds or fails on three things: a scope validated with the surgical team before design starts, a phasing plan that keeps the rest of the building running, and a turnover process that starts months before the first case. A general contractor with hands-on project management and trade coordination for occupied healthcare buildings is the person who ties those three together. At Expert Building Maintenance, Inc. (EBM), a Burr Ridge, Illinois contractor serving healthcare operators since 2001, that is the work we do on occupied facilities.

This guide is for the owner, administrator or project manager who has to commission the work. It covers what the scope contains, what the rooms must address, how construction is phased, which safety assessments come first, what drives cost, and how handover works.

Expert Building Maintenance, Inc
Plan Your Healthcare Renovation
EBM manages healthcare renovations in occupied facilities, coordinating trades and project work to help minimize disruption to daily operations.
Visit

Key Takeaways

  • Validate before you design: AORN's construction guidance starts with assessing the current OR, setting goals and engaging stakeholders, then moves through six phases from concept to close-out.
  • Build a multidisciplinary oversight team that includes perioperative nurses and an infection preventionist, not only architects and engineers.
  • Phasing, infection control risk assessment (ICRA) and interim life safety measures are planned before demolition, because they decide which rooms stay in service.
  • Budgets begin as estimates and are refined around the time the contractor is hired, so bring the contractor in early.
  • Start transition planning 9 to 12 months before move-in.

Table of Contents

What an operating room renovation involves

The work is rarely just new finishes. An OR sits on top of dense infrastructure: medical gas, ventilation and pressurization, normal and emergency power, ceiling-mounted equipment, data and video. Renovating the room means reworking all of it while the department around it often keeps operating.

AORN's manual organizes the project in six construction phases: Initiation and Concept, Planning and Design, Pre-Construction, Procurement, Construction, and Close-Out and Handover. It opens with validation: assess the existing OR, set renovation goals, engage stakeholders, then run feasibility studies, budgeting and approvals (AORN, Design & Construction, 2024).

Two scope sizes are common:

  • Room-level refresh. A few rooms are taken down to the shell and rebuilt with new ceilings, walls, flooring, lighting, booms and air devices, while the rest of the suite stays in service.
  • Suite-level modernization. Rooms are resized or converted, support spaces are relocated, and mechanical, electrical and medical gas systems are upgraded across the department.

The second type is what large health systems publish. The UC Davis Health OR modernization, for example, covers 24 ORs plus pre- and post-operative spaces, a waiting room, network and wireless upgrades and critical electrical infrastructure (UC Regents, May 2024). Most owners will work at a smaller scale, but the same questions apply.

Who needs to be at the table

AORN's safe-environment guidance says the organization should set up a multidisciplinary team to oversee any surgical suite construction or renovation. It names perioperative nurses, an infection preventionist, representatives of all affected disciplines, and the external design team of architects, interior designers and engineers (AORN, A Safe Environment of Care, Part 2).

The contractor belongs in that group early. Constructability, sequencing and trade coordination affect the design, not just the build. Our project management and construction coordination service exists for this reason: one point of accountability between the clinical team, the design team and the trades, with clear communication from planning through turnover.

What the renovated room has to get right

Layout and zones

ECRI's guideline recommends basing suite layout, activity-based zones and utility and HVAC needs on the allocated space, the facility's location and the predicted patient volume. It also calls for sizing rooms for the expected staff and for fixed and mobile equipment, and for identifying current and future space and technology needs when renovating (ECRI Guidelines Trust, 2023).

AORN's design guidance describes four set quadrants in the room: anesthesia at the head, circulation at the foot and sterile zones on both sides. It also recommends flush surfaces, recessed storage and overhead booms to reduce clutter, and finishes and fewer touch points to lower microbial load (AORN, 6 Design Elements of a Safe OR).

Four operating room zones and layout features

Workflow, tested before it is built

A peer-reviewed mock-up study of a universal OR found that the most frequent obstructions involved tray tables and surgical prep tables. Moving the sterile core door and pass-through toward the headwall kept traffic from crossing the prep area, and the study reported 58% fewer congestion instances involving prep-area items (SAGE, 2020).

The lesson for an owner is practical: a full-size mock-up with the surgical team is cheap compared with moving a door after the drywall is up.

When the room cannot grow

In an existing room, enlarging it or relocating fixed storage and doors may not be feasible. AORN notes that smaller changes can still improve flow, and quotes a design expert who found that angling the surgical bed improved space use and reduced bed movements. The advice is to observe current workflows objectively before deciding what to change (AORN).

Safety assessments come before demolition

AORN's manual calls for safety risk assessments before renovation work begins. The list includes an infection control risk assessment (ICRA, the method of rating how construction dust and activity could endanger patients), patient handling and movement, fall prevention, medication safety, behavioral health risk, patient immobility, security and electrical wet-location assessments, with risk categories identified per NFPA 99 (AORN, 2024).

Regulators are tightening the paperwork. Washington State's hospital construction rule, effective March 17, 2025, aligns with the 2022 editions of the Guidelines for Design and Construction of Hospitals and Outpatient Facilities. It requires an ICRA and an interim life safety plan before construction starts, and no one may occupy new or remodeled areas until the department and local jurisdictions approve (Washington State rulemaking). Illinois projects follow their own state and local requirements, so confirm the applicable code edition and review path with your architect and the authority having jurisdiction at the start.

Large projects show what this looks like on site. UC Davis's casework RFP for its modernization requires interim life safety measures plans and ICRA permits for work adjacent to or inside patient areas, and requires workers to be trained, tested and vaccinated before they start (UC Davis Health).

Dust and air control is where a contractor's daily discipline shows. Our guide to construction dust control for commercial renovation explains the barriers and routines used to keep work areas separated from occupied space.

Safety assessments come before demolition

Phasing a renovation in a working facility

The central question is how many rooms must stay available. Grady Health System's published modernization program is a clear example: about 52,300 square feet, six new ORs, relocated pre-op and PACU, and a phased refresh of 17 existing rooms, all with a stated goal of keeping at least 16 ORs functional at all times (Grady Health System RFP).

A workable phasing plan answers these questions in writing before work begins:

  1. Which rooms can go offline, and for how long? Tie each phase to the surgical schedule, not just the construction schedule.
  2. Where do the utilities run? Map every infrastructure line so that work in one room does not take a downstream room offline.
  3. How do crews, materials and debris move? Separate construction routes from patient, staff and sterile-supply routes.
  4. Who can stop work? Name the person on the clinical side with authority to pause construction when a case or an air-quality reading demands it.
  5. What happens at each phase boundary? Define testing and sign-off before the next area is released to clinical use.

Renovating while the building stays open is a core part of how we work. We coordinate construction activity around daily operations to limit disruption, and our article on renovating an occupied commercial building in Illinois walks through the sequencing logic. Much of it carries over to clinical spaces.

What drives cost and schedule

Published OR project budgets vary widely because scope varies widely. Two public examples show the spread:

ProjectScopePublished budget
UC Davis OR modernizationAbout 83,000 gross sq ft, 24 ORs, pre/post-op, electrical infrastructure$107.3 million requested from hospital reserves in May 2024, up from an anticipated $68 million (UC Regents)
Grady Health System OR modernizationAbout 52,300 sq ft, 6 new ORs, 17 refreshed$18,000,000 program construction budget (Grady RFP)

These are large academic and safety-net systems, and the two programs define their budgets differently, so do not divide one by the other to get a per-foot number for your project. What they show is the pattern behind every OR budget.

AORN describes the preliminary budget as a starting point that is refined before or just after the contractor is hired. It is driven by square footage, furniture, fixtures and equipment, design fees, construction costs and an allowance for miscellaneous costs (AORN, 2024). The UC Davis increase from $68 million to $107.3 million shows why a number set before design and preconstruction review should be treated as provisional.

The factors that move a number most in practice:

  • Building systems. Ventilation, pressurization, medical gas and electrical upgrades usually cost more than finishes.
  • Phasing. More phases mean longer duration and more temporary protection.
  • Existing conditions. Surprises behind walls and above ceilings are common in older buildings, so early investigation pays off.
  • Equipment timing. Booms, lights and integrated systems must be coordinated with the trades that support them.

For general planning in other commercial interiors, our guides to commercial building renovation scope, cost and process and medical office renovation show how we frame budgets and scope.

Commissioning, cleaning and turnover

Turnover is a project phase, not a final week. AORN advises beginning occupancy and transition planning 9 months to a year before the planned move-in date, so the team can find the smoothest operational transition (AORN, 2024). Under Washington's rule above, the room cannot be occupied until the required approvals are in hand, and other states set their own approval steps.

A close-out checklist should cover:

  • Punch list completed and re-inspected by the clinical lead, not only the design team.
  • Required inspections and agency approvals documented.
  • Building-system testing signed off for the phase.
  • Staff walk-throughs and equipment training scheduled before the first case.
  • A final clean of the finished space, since construction residue left on surfaces and in ceilings works against the room's infection-control design. Specialist cleaning of medical practices after renovation is part of this step.

A contractor who manages the project from demolition through final turnover keeps one set of records and one punch list. That makes close-out faster for your team.

Choosing a contractor for a healthcare renovation

Look for evidence in four areas:

  1. Experience renovating occupied buildings, with a clear approach to separating construction from operations.
  2. Hands-on project management and reliable trade coordination.
  3. Willingness to join planning early, so phasing, budget and constructability inform design.
  4. Clear communication, with a regular reporting rhythm your clinical leaders can follow.

How EBM supports healthcare renovations

EBM is a full-service commercial general contractor that manages projects from initial planning and demolition through construction and final turnover. Our healthcare work includes healthcare facility renovations, skilled nursing facility renovations, medical office buildouts and dialysis center buildouts, along with code compliance construction. We specialize in renovating occupied buildings and coordinate construction to minimize disruption to daily operations.

Expert Building Maintenance, Inc

If you are planning a healthcare renovation in Illinois or the Midwest, see our services or look at completed work on the projects page, including a skilled nursing facility renovation in Chicago.

FAQ

How long does an operating room renovation take?

It depends on scope and phasing. Published programs run for years: Grady's program lists a target start in June 2025 and completion in September 2028, and UC Davis's multi-permit project runs to April 2028. Smaller room-level refreshes are much shorter. Your schedule is set mainly by how many rooms must stay in service and by long-lead equipment.

Can an operating room be renovated while the rest of the department keeps working?

Yes, with phasing that maps patient, staff and utility flows so that construction does not take downstream rooms offline. Grady's program, for example, aims to keep at least 16 ORs functional at all times. An ICRA and interim life safety plan should be in place before work begins.

Who should be on the renovation team?

AORN's guidance calls for a multidisciplinary team: perioperative nurses, an infection preventionist, representatives of every affected discipline, and the architects, interior designers and engineers. Add the general contractor early so that sequencing and constructability inform the design.

When should we start planning the move back in?

AORN advises beginning occupancy and transition planning 9 months to a year before the planned move-in date. That gives time for staff training, equipment readiness, final cleaning and required approvals.