Commercial Construction Phases: What Happens and What You Approve

November 24, 2026
Commercial Construction Phases: What Happens and What You Approve

A commercial construction project moves through five broad phases: planning, design, permitting and procurement, construction, and closeout. Each one ends with decisions only the owner can make, and each depends on the one before it. If you know what those decisions are, you keep the budget and schedule under control. Since 2001, Expert Building Maintenance, Inc. (EBM) has managed commercial projects as a general contractor from planning and demolition through construction and final turnover, so the sequence below is the one we work through with owners, property managers and healthcare operators.

Expert Building Maintenance, Inc
Keep Your Project Moving Through Every Phase
EBM manages commercial projects from initial planning and demolition through construction and final turnover, with hands-on project management and trade coordination.
1Initial planning and demolition
2Construction and trade coordination
3Final turnover
Visit

Key Takeaways

  • Commercial projects follow a fixed order: project definition, design, permitting and bidding, construction, then commissioning and closeout. Steps can overlap, but none can be skipped without hurting the next one.
  • Design is staged at roughly 30%, 60% and 100% completion. Budget, scope, quality and schedule are reviewed at the end of each stage.
  • On site, trades follow a dependency chain: drywall waits for rough-in inspections, and finishes wait for a closed-in, heated building.
  • Renovations of occupied buildings and tenant improvements follow the same logic but put more weight on trade coordination and hidden conditions.
  • The project is not finished until the local authority issues a Certificate of Occupancy and the punch list is closed.

Table of Contents

The Big Picture: Three Stages Behind Five Phases

The AIA and the Associated General Contractors of America divide design and construction into project definition, design, and construction. Project definition covers discovery and integration. Design runs through schematic design, design development and construction drawings with specifications. Construction covers shop drawings, fabrication and delivery, and site work. The guidelines add that steps may overlap but none can be eliminated, and an incomplete step adversely affects the next one.

In practice, owners usually think in five phases, because permitting, bidding and procurement form a distinct stretch between drawings and the first day on site:

  1. Planning and programming
  2. Design
  3. Permitting, bidding and preconstruction
  4. Construction
  5. Commissioning and closeout

The rest of this article walks through each one and names what you decide.

Phase 1: Planning and Programming

This is where the owner defines why the project exists. Boston University's 2024 project manual describes planning as scoping and feasibility, programming, and conceptual planning. Vermont's state fact sheet says the programming phase defines project objectives, user requirements and scope of work, including occupant input and the zoning and building codes that apply.

An academic overview of building construction calls this predesign work the most crucial of the five phases and notes it is almost always managed by the owner and the owner's team. It is where function, size and economics are set, so every later phase inherits the quality of these answers.

What you decide:

  • What the space must do: patient rooms and nurse stations, dialysis chairs and water treatment, open office areas, retail frontage.
  • The budget range and the date you need to occupy.
  • Whether you are building new, renovating, or improving a leased suite.
  • Which code and licensing requirements apply to your use.

This is also the best time to bring in a general contractor. A contractor who reviews the program early can flag cost and schedule effects before drawings lock them in. Our commercial construction management service covers project management and trade coordination for exactly this kind of early input.

Phase 2: Design

Design converts the program into buildable documents in three steps. A building-industry textbook that cites the AIA owner-architect agreement defines them as schematic design at about 30% complete, design development at about 60%, and construction documents at 100%.

Schematic design

The architect turns the program into drawings of spaces, systems, finishes and site, with a probable cost estimate, according to the Vermont phase descriptions. Layout is the main question. For interior projects, a baseline plan helps here, and our guide to commercial space planning shows how a measured baseline becomes a buildable layout.

Design development

By the end of this stage, the drawings and specifications are complete enough to define the facility's size, function, configuration, equipment and materials, the cost estimate is updated, and permit applications are developed, per the same Vermont document. The academic overview notes that most decisions about products, materials and equipment are made here. Changes after this point cost more, because every discipline has already coordinated around the choices.

Custom items such as reception desks, nurse station casework and built-ins need their details settled now. See our overview of commercial millwork design for what those drawings should contain.

Construction documents

The final drawings and specifications establish the contractual requirements for every participant and become the legal record of the design, as a decision matrix by a specifications consultant puts it. Permits are submitted, and a final cost estimate accompanies the plans.

The owner's rule for design: Boston University's manual says quality, scope, budget and schedule are reviewed and approved at the end of each design subphase. Treat each sign-off as a gate. If the estimate does not match the budget at 30%, fix it there, not at 100%.

Phase 3: Permitting, Bidding and Preconstruction

Permits

Permitting runs alongside design, but it has a hard stop: the Boston University manual states that building permitting must be complete before construction begins, and that review time varies greatly with the size and complexity of the project and the workload of the permitting agency. The permit is issued by the local building department, which is an authority step no contractor can skip. A contractor familiar with local review cycles can help keep submissions complete, which is where most delays start.

Bidding or negotiation

In the classic design-bid-build approach, the owner hires the architect first, releases 100% documents for bid, and typically selects the lowest bidder, as the building-industry textbook explains. Bids are reviewed for completeness, compliance, suitability and cost. If every bid exceeds the authorized budget, the budget has to grow or the scope and quality have to change before work proceeds.

The delivery method changes when the contractor joins and how pricing happens. Our guide to types of construction contracts explains how to choose between them.

Preconstruction and procurement

Before mobilizing, the team finalizes the contract, subcontractor scopes, the schedule and the purchase of long-lead items. Deliverables at this point include 100% permit documents, a signed general contractor agreement and the construction permits, according to the Boston University manual. Long-lead equipment such as switchgear, HVAC units and structural steel can take months to arrive, so ordering belongs in this phase, not after groundbreaking.

Phase 4: Construction

HSM University's introductory construction course describes the typical on-site sequence for a new building:

  1. Mobilization and site preparation: fencing, site offices, temporary services, clearing, demolition and utility locates.
  2. Excavation, shoring and foundations: footings, piles or caissons, and foundation walls.
  3. Structure: concrete, steel or timber frame, floors and roof. This is often the critical path.
  4. Building envelope: exterior walls, windows, curtain wall and roofing, ending in "close-in."
  5. Rough-in: mechanical, plumbing, fire protection and electrical systems inside the walls and ceilings.
  6. Interior construction: framing, drywall, ceilings, doors, finishes and millwork.
  7. Site works: paving and landscaping.
  8. Commissioning, deficiencies and turnover.

The course notes the dependencies that govern the schedule: interior finishes cannot start until the building is closed in and heated, and drywall cannot close walls until rough-in inspections are passed. Superintendents coordinate trades with look-ahead schedules, area assignments and constraint tracking to avoid trades stacking on each other, out-of-sequence work and rework.

This coordination is the daily work of a general contractor, and it is where hands-on oversight pays off. When one trade slips, the next is not ready to follow, and the schedule moves unless someone re-sequences the work. Our article on construction project delays covers the usual causes and how to prevent them.

Inspections along the way

Inspections happen at milestones, not just at the end. The City of McKinney, Texas, publishes a new commercial construction guide that shows the typical order: erosion control first, then foundation, frame (with mechanical, electrical and plumbing rough-ins complete), cladding, ceiling cover, and final inspections. Requirements differ by jurisdiction, so your Illinois municipality's own permit sets the list. The pattern is consistent, though: foundation inspections come before backfill, framing before insulation or drywall, and rough-in before concealment.

Typical sequence of commercial construction inspections

Phase 5: Commissioning and Closeout

Once construction is substantially complete, systems are tested and tuned, deficiencies are listed and corrected, and the local authority issues the Certificate of Occupancy (CO), which authorizes people to use the building. The textbook cited above notes the construction phase ends when the local authority issues the CO. McKinney's guide adds that a shell building must receive a temporary or final CO before a tenant space can receive one, and that temporary certificates are typically granted for 30 days with extensions available. Check your own jurisdiction's rules.

Around this point the owner also plans occupancy tasks. Boston University's manual lists IT activation, security, signage, audio/visual and furniture installation as items the client plans with the project manager and user group.

Closeout paperwork includes operation and maintenance manuals, warranties, as-builts and the punch list of remaining fixes. Our guide to construction project closeout lists the documents and how a punch list should be run.

How Long Each Phase Takes

Durations vary widely by project size, so treat any range as a planning anchor, not a promise. Vermont's January 2023 fact sheet lists these ranges for a public building program:

PhaseTypical range
Programming6 to 14 months
Schematic design5 to 15 months
Design development5 to 12 months
Construction documents6 to 20 months
Bidding2 to 4 months
Construction administration6 to 24 months

Boston University's manual gives a similar picture for a large capital project: 6 to 12 months for planning, 6 to 12 for design, 6 for permitting and approval, and 24 to 60 for construction and closeout. Those are institutional campus projects. A tenant improvement or office buildout is much smaller and moves faster, but the same order and the same sources of delay apply: municipal review cycles, scope changes, long-lead materials and plan corrections.

Whatever the size, track the schedule against a short list of measures. A guide to tracking construction KPIs explains what to monitor on a dashboard. For EBM's own view of how a project unfolds in time, see our construction project timeline.

How Long Each Phase Takes

How the Phases Change by Project Type

The order stays the same, but the weight of each phase shifts.

  • New construction starts from an empty site, so planning and design carry the most weight, and site work and foundations add steps at the front of construction.
  • Major renovation keeps part of the building. Hidden conditions behind existing walls, such as old conduit routes or undersized panels, can force changes midstream, so early investigation and a contingency matter.
  • Tenant improvements and office buildouts are smaller in footprint, with the work concentrated in interiors, permits and trade coordination. The landlord's approvals and building rules are part of the schedule.
  • Occupied facilities such as nursing homes, senior living communities and operating dialysis centers add phasing: work is split into zones so patients, residents and staff keep using the rest of the building.

That last case is a specialty of ours. EBM renovates occupied buildings and coordinates construction activity to minimize disruption to daily operations. Our work spans skilled nursing facility renovations, dialysis center buildouts, and office buildouts and tenant improvements. For interior work specifically, see our page on commercial interior renovation in Illinois.

What You Approve at Each Phase

The owner holds legal title, pays for the facility, and defines the scope and the contract structure for everyone else, according to the building-industry textbook. The lead designer, usually an architect, contracts directly with the owner and manages the design documents. In design-bid-build, the architect reviews the contractor's work and payment requests but holds no contract with the contractor, so claims follow contract relationships.

PhaseYour main approvals
PlanningProgram, budget range, target occupancy date
Schematic designLayout, probable cost, major systems
Design developmentMaterials, equipment, updated estimate
Construction documentsFinal drawings, specifications, permit submission
Bidding and preconstructionContractor selection, contract, schedule, long-lead orders
ConstructionChange orders, payment applications, phasing in occupied areas
CloseoutPunch list, warranties, occupancy readiness

The AIA's guide to integrated project delivery makes a related point: decisions work better when all participants bring their expertise to each issue, and more frequent meetings let the group adapt to circumstances. Whatever the delivery method, a standing weekly meeting between owner, architect and contractor keeps approvals from becoming bottlenecks.

Working With EBM Through the Phases

EBM is a full-service commercial general contractor based in Burr Ridge, Illinois, serving the Greater Chicago area, Illinois and the Midwest. We manage projects from initial planning and demolition through construction and final turnover, with project management, trade coordination, code compliance upgrades and interior finishes handled under one contract. Our clients include healthcare operators, senior living providers, property managers, commercial property owners and developers.

Expert Building Maintenance, Inc

If you are planning a renovation, buildout or ground-up project, start with our commercial construction services, or look at completed work on our projects page.

FAQ

What are the main phases of commercial construction?

The main phases are planning, design, permitting and bidding, construction, and closeout. Design is usually split into schematic design, design development and construction documents. Construction runs from site preparation and foundations through structure, envelope, rough-in, interiors and final inspections.

How long does a commercial construction project take?

It depends on size, complexity and municipal review. Vermont's state fact sheet lists 6 to 24 months for the construction phase of a public building, and Boston University's manual lists 24 to 60 months for large campus projects. Smaller interior buildouts take much less time, and your contractor can give a schedule once the scope is defined.

When should I hire a general contractor?

Ideally during planning or early design, while cost and schedule can still shape the drawings. Hiring at the bidding stage is also common, but early input helps catch constructability and budget problems before they are drawn in.

What is a Certificate of Occupancy?

It is the document the local building authority issues to confirm the building meets code and may be occupied. It is the legal authorization to use the space, so the final inspection and any temporary certificate should be planned into the schedule.

How is renovating an occupied building different?

The phases are the same, but the work is sequenced in zones so daily operations continue. That makes trade coordination and communication with staff, residents or patients central to the schedule.